{"id":16378,"date":"2011-08-11T21:15:31","date_gmt":"2011-08-11T18:15:31","guid":{"rendered":"http:\/\/peacenow.org.il\/en\/?p=16378"},"modified":"2016-01-27T21:29:51","modified_gmt":"2016-01-27T18:29:51","slug":"peace-now-condemns-interior-ministers-cynical-use-of-housing-crisis","status":"publish","type":"post","link":"https:\/\/peacenow.org.il\/en\/peace-now-condemns-interior-ministers-cynical-use-of-housing-crisis","title":{"rendered":"Peace Now Condemns Interior Minister\u2019s Cynical use of Housing Crisis"},"content":{"rendered":"<p dir=\"ltr\"><strong>More Construction Approved in East Jerusalem \u2013 the Details<\/strong><\/p>\n<p dir=\"ltr\">Today the Interior Minister Eli Ishai released <a href=\"http:\/\/www.haaretz.com\/news\/diplomacy-defense\/israel-to-build-thousands-of-new-housing-units-in-east-jerusalem-1.378146\" target=\"_blank\">a press statement<\/a> detailing his authorization of construction of thousands of housing units in East Jerusalem and over the Green Line.<\/p>\n<p dir=\"ltr\">The construction referred to is three separate locations:<\/p>\n<p dir=\"ltr\"><strong>1. Pisgat Zeev<\/strong> &#8211;\u00a0The plan authorize 625 housing units, <a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/12\/02\/pisgatzeevnort\/\" target=\"_blank\">plan no. 11647<\/a>, that we have reported on previously\u00a0\u00a0\u2013 is now passed all the relevant procedures \u2013 objections were rejected and it now passed the authorization process through the Interior Minsiter\u2019s office.<\/p>\n<div id=\"attachment_16380\" style=\"width: 460px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-16380\" class=\"wp-image-16380 size-full\" src=\"http:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/pisgat-zeev-north-11647-eng.jpg\" alt=\"pisgat-zeev-north-11647-eng\" width=\"450\" height=\"364\" srcset=\"https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/pisgat-zeev-north-11647-eng.jpg 450w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/pisgat-zeev-north-11647-eng-161x130.jpg 161w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/pisgat-zeev-north-11647-eng-330x267.jpg 330w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><p id=\"caption-attachment-16380\" class=\"wp-caption-text\"><a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/12\/02\/pisgatzeevnort\/\" target=\"_blank\">The Pisgat Zeev Plan<\/a><\/p><\/div>\n<p dir=\"ltr\"><strong>2. Ramat Shlomo<\/strong>\u00a0(Plan No. 11085, also known as <a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/03\/09\/the-new-plan-for-1600-housing-units-in-ramat-shlomo\/\" target=\"_blank\">the Biden plan<\/a>, due to its original publication during Biden\u2019s visit) &#8211; The plan refers to 1600 units. According to the press release, the Minister claims to have issued final authorization. However the plan was never deposited for public review, and the regional committee is still working on the preparations for the depositing (last hearing was held two weeks ago on July 24th, 2011).<\/p>\n<p dir=\"ltr\">Either the press release is wrong and the Interior Ministry was referring to the depositing stage that might take place soon and announced as if it was finally approved, or if the statement is true that Ishai did sign to authorize the construction (without the depositing stage), then we will appeal to the courts who will cancel the authorization as the plans cannot legally go ahead without passing the depositing stage.<\/p>\n<div id=\"attachment_13615\" style=\"width: 340px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-13615\" class=\"size-large wp-image-13615\" src=\"http:\/\/peacenow.org.il\/wp-content\/uploads\/2016\/01\/ramat-shlomo-11085-330x268.jpg\" alt=\"The Ramat Shlomo Plan\" width=\"330\" height=\"268\" srcset=\"https:\/\/peacenow.org.il\/wp-content\/uploads\/2016\/01\/ramat-shlomo-11085-330x268.jpg 330w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2016\/01\/ramat-shlomo-11085-161x131.jpg 161w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2016\/01\/ramat-shlomo-11085.jpg 1385w\" sizes=\"auto, (max-width: 330px) 100vw, 330px\" \/><p id=\"caption-attachment-13615\" class=\"wp-caption-text\"><a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/03\/09\/the-new-plan-for-1600-housing-units-in-ramat-shlomo\/\" target=\"_blank\">The Ramat Shlomo Plan<\/a><\/p><\/div>\n<p dir=\"ltr\"><strong>3. Givat Hamatos<\/strong> &#8211; \u00a0<a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/03\/08\/trying-to-make-sense-of-the-east-jerusalem-numbers-what-we-think-we-know-about-new-plans-for-construction-and-demolition\/\" target=\"_blank\">Plan no. 5438A<\/a> for some 2,000 units\u00a0&#8211; the plan got the final appoval of the reigional committee on 9\/9\/2008 (under Olmert&#8217;s term). The approval for the plan was granted only under the condition that only after the parcelation procedures are completed can the Interior Minister sign the plan and make it valid.\u00a0As opposed to other plans in East Jerusalem, this plan is not on land that was confiscated by the state but on privately owned lands. In order to implement construction, a long process of \u201cparcelation\u201d of the land between the various owners needs to take place. This procedure is very complicated and takes years, we know in recent weeks a preliminary \u201cparcelation\u201d plan was submitted to a to local committee in Jerusalem.<\/p>\n<p dir=\"ltr\">The Minister must have used this as the chance to authorise the plan. However until construction is actually seen on the ground the parcelation procedure still faces a long process of approvals.<\/p>\n<div id=\"attachment_16383\" style=\"width: 460px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-16383\" class=\"size-full wp-image-16383\" src=\"http:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/givat-hamatos1.jpg\" alt=\"The Givat Hamatos Plan\" width=\"450\" height=\"348\" srcset=\"https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/givat-hamatos1.jpg 450w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/givat-hamatos1-161x125.jpg 161w, https:\/\/peacenow.org.il\/wp-content\/uploads\/2011\/08\/givat-hamatos1-330x255.jpg 330w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><p id=\"caption-attachment-16383\" class=\"wp-caption-text\"><a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/2010\/03\/08\/trying-to-make-sense-of-the-east-jerusalem-numbers-what-we-think-we-know-about-new-plans-for-construction-and-demolition\/\" target=\"_blank\">The Givat Hamatos Plan<\/a><\/p><\/div>\n<p dir=\"ltr\">Today\u2019s press statement further shows that this govt is cynically using the current housing crisis in Israel to promote construction in the settlements and serves only extreme right wing ideology.<\/p>\n<p dir=\"ltr\">Interior Minister Eli Ishai\u2019s actions destroys\u00a0\u00a0the chance of reaching any political solution in Jerusalem, and deals a fatal blow to Israel\u2019s status on the eve of the UN Assembly meeting.<\/p>\n<p dir=\"ltr\">Also see more details on construction in Har Homa on <a href=\"http:\/\/settlementwatcheastjerusalem.wordpress.com\/\" target=\"_blank\">Hagit Ofran\u2019s Blog<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>More Construction Approved in East Jerusalem \u2013 the Details Today the Interior Minister Eli Ishai released a press statement detailing his authorization of construction of thousands of housing units in East Jerusalem and over the Green Line. The construction referred to is three separate locations: 1. Pisgat Zeev &#8211;\u00a0The plan authorize 625 housing units, plan&#8230;  <a class=\"excerpt-read-more\" href=\"https:\/\/peacenow.org.il\/en\/peace-now-condemns-interior-ministers-cynical-use-of-housing-crisis\" title=\"Read Peace Now Condemns Interior Minister\u2019s Cynical use of Housing Crisis\">Read more &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":16383,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2,16],"tags":[46,1345,1499,1503,1344],"class_list":["post-16378","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campaigns","category-settlement-watch","tag-east-jerusalem","tag-givat-hamatos","tag-har-homa","tag-pisgat-zeev","tag-ramat-shlomo"],"acf":[],"_links":{"self":[{"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/posts\/16378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/comments?post=16378"}],"version-history":[{"count":5,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/posts\/16378\/revisions"}],"predecessor-version":[{"id":16387,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/posts\/16378\/revisions\/16387"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/media\/16383"}],"wp:attachment":[{"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/media?parent=16378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/categories?post=16378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/peacenow.org.il\/en\/wp-json\/wp\/v2\/tags?post=16378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}